AER's IAR back in business
The IAR is back up after 6 days of down time.
The Alberta Energy Regulator's website called the Integrated Application Registry came back up yesterday evening (May 27) before 8 pm. It had been down for 6 days.
During that time, no applications were approved by the regulator. Also no orders for past application documents were filled.
Because of the large backlog in the AER's application order department, time to fill applications is now over 30 days.
During the outage, AppIntel, Regaware's application website was still up and functioning properly. AppIntel subscribers were still able to get applications on demand from AppIntel.
?subject=Sign me up for an AppIntel subscription&body=Sign me up for an AppIntel subscription so I can still access application intelligence even when the IAR is down%0D%0A%0D%0AMy name _________%0D%0AMy phone number _________%0D%0A%0D%0A(Or, if your need is urgent, call AppIntel Sales at 403 803 2500)">Contact us about an AppIntel subscription.
Tags: Regulator, Closure
Granger Low 27 May 2015

Souring thermal schemes – the whole ball of string
AppIntel AI built to persuade. Loaded with evidence.

Flowback water has a second life
Frack water is too expensive to waste

9 potent ways to enhance steam injection: SAGD
Methane, propane, solvent or surfactant?

Let AppIntel AI watch this CO2 dispute for you
19 new developments today




Calgary, Alberta, Canada
Share